Verify the cut list and send the project to MES
After a design is finalised, verify the cut list and send the project to the MES portal for factory production.
The design portal itself is where existing catalogue items are used or new items are customised.
✓ Checked in the product on 19 October 2026The cut-list verification and MES hand-off are the production-side steps.
After a design is finalised, the production manager or production designer verifies the cut list and then sends the project to the MES (Manufacturing Execution System) portal for factory production.
✓ Checked in the product on 19 October 2026