Follow a project from the design portal through the production team's QC check into the MES portal, where its outputs become available.

  1. After a project is designed in the design portal, it is sent to production design.

    ✓ Checked in the product on 16 October 2026
  2. In production design, the production team performs a QC check on the designs.

    ✓ Checked in the product on 16 October 2026
  3. After QC, the project reaches the MES portal when its production design is published: in the production design, Production > Publish ('Publish to a Work Order') publishes its panels to a work order in MES. QC mode itself (Materials Used, Units, Panels, Hardwares Used) is a review: it has no step that completes QC or sends the project to MES.

  4. In the MES portal, a work order offers the production outputs: cut lists (CSV), raw materials, board layouts, CNC machine files and panel drawings, and assembly outputs (exploded view, Assembly BOQ). Pricing and quotations are not MES outputs: they stay with the design and its production design (Pricing).