Infurnia مدد

یہ صفحہ ابھی اردو میں دستیاب نہیں ہے۔

Production

Correct wrong materials and push the change to production

Fix excess or wrong material types in the design and re-sync the work order so production picks it up.

  1. Correct wrong or excess material types by selecting the units and using the change-material action.

    ✓ 19 اکتوبر، 2026 کو پروڈکٹ میں جانچا گیا
  2. Material changes such as switching a panel core from BWP to HDHMR are made in the design (QC mode's Materials Used / Units / Panels views), not in the production output screen.

    ✓ 19 اکتوبر، 2026 کو پروڈکٹ میں جانچا گیا
  3. The production output picks the change up once the work order is re-synced with the design and published.