Infurnia ସହାୟତା

ଏହି ପୃଷ୍ଠା ଏପର୍ଯ୍ୟନ୍ତ ଓଡ଼ିଆ ଭାଷାରେ ଉପଲବ୍ଧ ନାହିଁ।

Production

Find your way around a production design copy's Production tab

Open a production design copy and use the Production tab toolbar and the Differences between work order and design dialog to compare the work order with the design.

  1. A production design copy (made with 'Create a Production Design Copy') opens with its Production tab.

  2. The Production tab's toolbar ends with Publish (WO), Resync, Diff.. and Reset after Cut List, Board L.., Raw Ma.., Schedule, Install.., Setting and Work Sc..

  3. The Work Order Cutlist screen's 'Differences between work order and design' dialog has three tabs — New in design, Not in design and Modified — and selecting a part shows the changed properties with the old value struck through in red and the current value in green, the green value being what is currently present in the production design.