Publish a work order after verifying design and production details
Verify the 3D design and production details, then publish a work order to send a project to production.
To send a project to production, first verify the 3D design and production details, then publish a work order.
✓ ଅକ୍ଟୋବର 16, 2026 ରେ ପ୍ରଡକ୍ଟରେ ଯାଞ୍ଚ କରାଯାଇଛିWhen publishing, give the work order a name and set the delivery date.
✓ ଅକ୍ଟୋବର 16, 2026 ରେ ପ୍ରଡକ୍ଟରେ ଯାଞ୍ଚ କରାଯାଇଛିThe MES portal also lets you add MES operators and map them to stations so panel progress can be tracked per station.
✓ ଅକ୍ଟୋବର 16, 2026 ରେ ପ୍ରଡକ୍ଟରେ ଯାଞ୍ଚ କରାଯାଇଛି