Publish a work order after verifying design and production details
Verify the 3D design and production details, then publish a work order to send a project to production.
To send a project to production, first verify the 3D design and production details, then publish a work order.
✓ Comprobado en el producto el 16 de octubre de 2026When publishing, give the work order a name and set the delivery date.
✓ Comprobado en el producto el 16 de octubre de 2026The MES portal also lets you add MES operators and map them to stations so panel progress can be tracked per station.
✓ Comprobado en el producto el 16 de octubre de 2026