Infurnia Help
MES

Publish a work order after verifying design and production details

Verify the 3D design and production details, then publish a work order to send a project to production.

  1. To send a project to production, first verify the 3D design and production details, then publish a work order.

    ✓ Checked in the product on 16 October 2026
  2. When publishing, give the work order a name and set the delivery date.

    ✓ Checked in the product on 16 October 2026
  3. The MES portal also lets you add MES operators and map them to stations so panel progress can be tracked per station.

    ✓ Checked in the product on 16 October 2026