Edit connector and construction changes through production design
Send the design to production from Outputs, create a new production and open the production design so you can review and modify connector scenarios there.
To edit connector and construction changes, go to Outputs and send the design to production, then create a new production and open the production design.
✓ Verificato nel prodotto il 10 ottobre 2026Inside the production design, connector scenarios can be reviewed and modified.
✓ Verificato nel prodotto il 10 ottobre 2026