Edit connector and construction changes through production design
Send the design to production from Outputs, create a new production and open the production design so you can review and modify connector scenarios there.
To edit connector and construction changes, go to Outputs and send the design to production, then create a new production and open the production design.
✓ Comprobado en el producto el 10 de octubre de 2026Inside the production design, connector scenarios can be reviewed and modified.
✓ Comprobado en el producto el 10 de octubre de 2026