Infurnia 帮助

此页面暂无简体中文版本。

Production

Republish a design so the work order cut list is up to date

Make or verify a change in the production design and republish it so the work order cut list picks up the updated values.

  1. When a design changes after a work order has been created — for example a panel's material or size is changed — the work order's cut list is no longer accurate until the design is re-synced and the work order republished.

  2. Open the production design, make or verify the change, and republish the design so the work order cut list picks up the updated values.

  3. Operators can check the 'Last published' date on the Work Orders list before starting a project, as an extra verification step that they are working with the latest published files.