Apply manufacturing rule costs per panel by ply area

Learn how additional cost in manufacturing rules is applied per panel by ply area and how to get a percentage-style uplift instead.

  1. In manufacturing rules, the additional cost entered is applied per panel based on ply area, not as a percentage of the overall cost.

    ✓ 2026年10月20日に製品で確認済み
  2. To apply a percentage-style uplift, use the wastage factor field, which accepts a percentage.

    ✓ 2026年10月20日に製品で確認済み
  3. When a factory cost is common across panel types, create the manufacturing rule once and clone it for the other boards or panel types instead of building each rule from scratch.