Infurnia Hilfe

Diese Seite ist noch nicht auf Deutsch verfügbar.

Pricing

Apply manufacturing rule costs per panel by ply area

Learn how additional cost in manufacturing rules is applied per panel by ply area and how to get a percentage-style uplift instead.

  1. In manufacturing rules, the additional cost entered is applied per panel based on ply area, not as a percentage of the overall cost.

    ✓ Am 20. Oktober 2026 im Produkt geprüft
  2. To apply a percentage-style uplift, use the wastage factor field, which accepts a percentage.

    ✓ Am 20. Oktober 2026 im Produkt geprüft
  3. When a factory cost is common across panel types, create the manufacturing rule once and clone it for the other boards or panel types instead of building each rule from scratch.