Infurnia Help
Design

Lock a design to freeze it, then approve after QC

Lock a design from the Project Hub so no changes are made while it is checked, then approve it once QC is done.

  1. A design can be locked from the Project Hub to freeze it completely, so no further changes are made while it is checked and verified before being pushed to production.

    ✓ Checked in the product on 20 October 2026
  2. Once the QC or checking stage is done, the design can be approved.

    ✓ Checked in the product on 20 October 2026