Drawer bottom elevation is 12 and construction setting is 20
Connectors are already present in the construction.
Connectors are already present in the construction.
✓ ଅକ୍ଟୋବର 18, 2026 ରେ ପ୍ରଡକ୍ଟରେ ଯାଞ୍ଚ କରାଯାଇଛି
ଏହି ପୃଷ୍ଠା ଏପର୍ଯ୍ୟନ୍ତ ଓଡ଼ିଆ ଭାଷାରେ ଉପଲବ୍ଧ ନାହିଁ।
Connectors are already present in the construction.
Connectors are already present in the construction.
✓ ଅକ୍ଟୋବର 18, 2026 ରେ ପ୍ରଡକ୍ଟରେ ଯାଞ୍ଚ କରାଯାଇଛି