MES
Guide: 43 · Sezioni: 4
Accesso e configurazione del portale MES15
- Access the MES portal from the admin spaceLearn when the MES portal is used and who it is intended for.
- Access the MES portal to view work ordersOpen the MES portal directly to view work orders and explore the module.
- Choose between the MES Admin and Production Designer rolesGive a production user either MES-only access with the MES Admin role or design plus MES access with the Production Designer role.
- Give a user MES Operator access by adding their email IDAdd a user's email ID to grant them MES Operator access.
- Open MES in Chrome on an Android phoneOpen MES in Chrome on an Android phone for tracking, keeping in mind that desktop Chrome is the main supported environment.
- Publish a work order after verifying design and production detailsVerify the 3D design and production details, then publish a work order to send a project to production.
Mostra tutte (15)
- Add MES operators with an email ID as usernameAdd MES operators using an email ID, which acts as the username they log in with.
- Open a published work order in the view-only portalOpen the published version of a work order to see it in a view-only portal.
- Read a work order's Order Progress tab and tracking dataUse the Order Progress tab's station and status filters, download the tracking CSV to see how each panel was tracked, and know what the Manage menu and Reset dialog offer.
- Track factory panels as an MES operator, including on mobileTrack panels at your mapped station or on a mobile phone through the MES app, and open work order units and designs in 3D.
- Track order stage and packing status in the MES portalTrack your orders and check their current stage, packaging and dispatch status remotely through the MES portal.
- Understand what MES admin access lets you doMES admin access lets a user perform admin activities in the MES portal such as assigning stations, adding machines and changing panel label designs.
- Understand what the restriction area affectsLearn that the restricted area in machine settings applies to surface operations such as grooving.
- Understand work order name, coding, production name and design nameLearn how the work order name, work order coding, production name and design name are distinct identifiers.
- View published work orders and their outputs from MESOpen the MES work order section to see all published work orders and understand what their manual download and assembly files are for.
Pacchi, scatole ed etichette14
- Customize panel label fields by ticking or unticking sectionsTick or untick the available sections to control what information appears on a panel label.
- Stampa le etichette dei pannelli e le liste di imballaggio dal portale MESDisimballa i pannelli, stampa le etichette dal portale MES e scarica le etichette delle scatole e le liste di imballaggio una volta confermato l'imballaggio.
- Crea scatola, aggiungi pannelli scansionati, stampa etichetta, chiudi scatolaImballa i pannelli in una scatola nel portale MES, stampane l'etichetta e chiudila in modo che la scatola possa essere tracciata durante la spedizione.
- Create box labels with QR codes to track contents and shippingCreate box labels with QR codes so scanning them tracks which panels are inside each box and the box's shipping status, with contents and dispatch traceable from the MES portal.
- Customize panel labels with logo, QR, dimensions and edge bandSet up a panel label template that carries your logo, edge band details, QR code, dimensions, borders, spacing and font size, then print each label as you cut.
- Traccia i pannelli nella pagina MES Tracking su un telefonoTraccia i pannelli dal tuo telefono tramite fotocamera o inserimento manuale del codice e gestisci i pannelli già tracciati.
Mostra tutte (14)
- Creare un nuovo collo nel portale MES tramite fotocamera o inserimento manualeApri un ordine di lavoro e acquisisci ogni collo tramite scansione con fotocamera o inserimento manuale, così puoi stampare le relative etichette e la distinta di imballaggio.
- Create a shipment on the MES Shipment pageCreate a shipment and fill in its Shipment Details dialog with driver, vehicle, origin and receiver information before loading boxes.
- Find MES settings tabs and the Shipment pageLearn which tabs MES Settings holds and where shipments are handled as their own nav page.
- Come funzionano le etichette dei fogli MESScopri cosa contengono le etichette dei fogli MES e come gli operatori le usano per eseguire i file di taglio per i fogli frazionari.
- Aggiungi più stazioni di fabbrica e usa gli account operatore MESAggiungi più di una stazione di fabbrica e consenti agli operatori di scansionare le etichette per raggruppare i pannelli in scatole e verificare l'avanzamento del carico alla stazione di spedizione.
- Download saw files, sheet labels and panel labels from a Board LayoutDownload saw files, sheet labels and panel labels from a work order's Board Layout by first choosing the machine each one depends on.
- How panels auto-rotate when a groove falls in a restricted areaLearn how a panel is turned automatically when a groove falls inside a restricted area, up to a total of 180°.
- Stampa le etichette dei pannelli subito dopo ogni taglio nel taglio assistitoEtichetta ogni pannello subito dopo il taglio, così ciascuno resta identificato correttamente.
File di produzione e download8
- Come MES genera i file di download per le macchine CNCMES può generare file di download per macchine CNC di diversi tipi, comprese le macchine CNC a trave e le macchine CNC generiche.
- Scarica distinte di taglio, BQ materiali e BQ ferramenta dal MESScarica la distinta di taglio, il BQ materiali e il BQ ferramenta da un ordine di lavoro MES per avere le quantità di materie prime e ferramenta archiviate.
- Find cabinet-level exploded assembly drawings in MESSee cabinet-wise drawings as cabinet-level exploded drawings in the assembly view, and find panel sizes and cabinet hardware details in the cabinet composite BOQ.
- Comprendere i file generati da una macchina Biesse Nest CIXScopri cosa contiene ciascun file nello zip Machine Files di una macchina Biesse Nest CIX e come vengono misurati i valori Y di ostruzione del bloccaggio.
- Configura gli utensili della macchina su MES portal prima di scaricare i fileInserisci i dati degli utensili della macchina del cliente su MES portal per poter scaricare i file macchina richiesti.
- Scarica i file di produzione dal portale MESOttieni la distinta di taglio, le liste di approvvigionamento, la disposizione dei pannelli e i disegni esplosi di cui hai bisogno dopo la pubblicazione.
Mostra tutte (8)
- How the cabinet composite BOQ provides panel sizes and hardware detailsLearn what the cabinet composite BOQ contains and when to use it as the reference source for panel dimensions.
- Understand the MES Basic cut list Download CSV layout and settings checkLearn what a MES work order's Basic cut list Download CSV contains and how work-order cutlist settings are compared with the admin's before export.
Ordini di lavoro, fatturazione e uso dei materiali6
- Check panel usage per project and work order in MESOpen the Usage page in the MES portal to see how many panels each project and work order consumed, month by month.
- How panel billing counts published work ordersLearn how MES panel usage and billing are calculated from published work orders and how unpublished versions affect them.
- Come il report di incollaggio MES dettaglia i fogli frazionariScopri come il report di incollaggio MES presenta i dati dei fogli frazionari per SKU core e come da esso vengono stimate le quantità degli SKU di finitura.
- Publishing over 1,000 panels per month incurs extra per-panel feesLearn when a single design should be split into multiple work orders.
- Reduce material waste with least material optimization and fractional sheetsPair the least material optimization criteria with deep fractional sheet support in MES to cut material waste across production stages.
- Track work orders and production progress in MESManage work orders in MES and view tracking details such as the number of panels listed and how much has been produced and completed.