Schedules on sheets
Guides: 21
- Add material, shutter, carcass and handle schedules to a presentationInsert material and cabinet schedules into a presentation and import the design's materials and units so each room and elevation is listed on the sheet.
- Add a material schedule and set its columnsAdd a material schedule, import the materials used in the drawing, then change its columns through Edit Fields.
- Add finish and hardware schedules to a working drawingBring shutter, carcass, finish and hardware details into a presentation so the client sees what is supplied.
- Add material schedules and legends to a sheet one material at a timeShow material schedules and legends on a sheet by adding each material one by one, or build the same legend manually with the line and text tools.
- Carry materials and schedules on a sheet templatePut material fields and schedule tables on the template so they repeat on every generated presentation.
- Choose and reorder schedule columns with Edit FieldsSet the active columns of a schedule, add image fields and adjust its text size, row height and column width.
- Create a new schedule from an item typeOpen Schedule Configuration from Outputs > Schedule (BOQ) > Create New Schedules, then start a new schedule from one item type picked from a grouped list and confirmed with Apply Selection.
- Export, print and manage an imported scheduleOpen an imported schedule in schedule mode to export it as CSV or xlsx, print it as PDF, and rename or delete it from Schedules in use.
- Filter a Unit Listing schedule by building or floorPick a level such as a building or floor in the Filters section so the schedule lists only the cabinets in that area.
- Filter a schedule component to a room or elevationNarrow which line items a schedule shows by using the filter controls on the left of its panel.
- Format the header rows of a dynamic scheduleStyle the title, filter and column header rows of a dynamic schedule separately from its body, and adjust columns so headings fit.
- How finish annotations label finishes as L1, L2, L3 for schedulesLearn how finish annotations add finish labels such as L1, L2, L3, L4, L5 across the design and map each label to a finish in the schedule.
- How schedule unit names carry forward from admin portal cabinet namesLearn where the name shown for a unit in the schedule comes from.
- Limit a unit schedule to one elevationAdd a unit schedule and choose an elevation in its Filters so it lists only the modular items placed in that elevation.
- Show SKU, description, serial number and parent cabinet in schedulesLet schedule fields display the SKU, description, serial number and parent cabinet without typing the parent cabinet manually.
- Split a long schedule across sheets using copies and filtersSplit a schedule that is too long for one page across several sheets by copying it and filtering each copy to the units it should show.
- Split handle schedules per room instead of one combined slideGive each room or studio its own handle schedule so kitchen, wardrobe, living and master handles are listed separately.
- What the built-in Unit Listing schedule coversLearn which units the Unit Listing schedule lists and which columns it shows by default.
- Build presentations from views, sheets, images and schedulesAssemble a presentation from generated views, custom sheets, uploaded images and imported schedules.
- Fix tiny text in a dynamic schedule by resizing its boxUnderstand how a dynamic schedule fits its drawn box so you can keep rows readable instead of letting them compress to a 1 mm floor.
- Show handle detailing with tables or schedulesShow detailing for elements such as handles using tables or schedules in the presentation.