مساعدة Infurnia

“All trade words in English” is not ready for these pages yet, so they are shown with “Common trade words in English”.

Production

أنشئ مخطط القص واختر قبول أو إلغاء أو إعادة التوليد

افتح علامة التبويب ⁦Board Layout⁩ لبدء التوليد، ثم قرر ما إذا كنت ستقبل أفضل مخطط حتى الآن، أو تلغي التشغيل، أو تفرض إعادة توليد جديدة.

  1. Opening the Board Layout tab in a work order triggers layout generation. A 'Generating Board Layout' modal shows overall progress, an iteration counter, an OVERALL totals bar and per-board-type cards with the best solution so far (sheets, estimated time, offcut area). Two exits: 'Accept & Continue' stops the optimization early and keeps the best layout found so far (the confirm reminds the user they can Force Re-generate later); 'Abort run' permanently discards the run, behind a danger confirmation. Board types whose result was reused from a previous run's cache are hidden from the progress modal - seeing fewer cards than board types is normal. Nesting-type layouts show sheets-only stats (no time/offcut figures, which only apply to straight cuts). To recompute from scratch, use the '...' menu in the board layout header and pick 'Re-generate' (its confirmation, 'Force Regeneration', says it discards all current layouts). On the board type listing, a card showing '-' for panels and yield means generation did not succeed for that board; clicking it re-triggers generation, and a card with zero panels shows a 'This board has no panels' message instead of opening.

  2. ⁦'Re-generate'⁩ في قائمة ⁦'...'⁩ برأس مخطط القص (تأكيدها بعنوان ⁦'Force Regeneration'⁩: 'إعادة توليد مخطط القص لكل أنواع الألواح؟ هذا يتجاهل كل مخططات القص الحالية.') يتجاهل أي مواضع سحب وإفلات يدوية أُجريت على مخطط القص ويعيد بناء مخطط جديد مولّد من النظام.

  3. ترك التوليد يعمل حتى الاكتمال بدلًا من النقر على ⁦'Accept & Continue'⁩ مبكرًا يمنح المحسّن الوقت الكامل الذي يحتاجه لتجربة تركيبات ملاءمة الألواح وإرجاع أفضل مخطط يمكنه إيجاده.