Skip to main content
All CollectionsManufacture Setting up Cut-list
How to set the gap in between double swing shutters?
How to set the gap in between double swing shutters?
Updated over a week ago

Individual SKU Modification:

  1. Open Admin Portal:

    • Navigate to the specific subcategory and group where your SKU resides.

    • Select the particular SKU to activate it.

  2. Edit SKU Structure:

    • Click on Edit SKU Structure to open the cabinet in its component view.

  3. Modify Shutter Gap:

    • Click on any of the shutters and go to the Shutter System option.

    • Navigate to the Construction tab.

    • Find the Shutter Gap option, which is set to 2mm by default in Infurnia.

    • Input the revised value for the shutter gap, for example, 20mm.

    • You will see the gap between the two shutters updated to 20mm.

  4. Save Changes:

    • Save the changes to ensure they are applied to the SKU.

Bulk Modification for Multiple SKUs:

  1. Select Multiple SKUs:

    • Select all the SKUs you want to modify by checking the boxes next to them.

  2. Initiate Bulk Action:

    • Click on Bulk Action and select Bulk Edit SKU Structure.

    • Confirm your selection and proceed to editing.

  3. Modify Shutter Gap in Bulk:

    • Go to the Partition tab since a shutter is always added at a partition level in Infurnia.

    • Click on Add Partition.

    • The first detail required is the Partition ID, which is typically partition_1 for the outermost partition.

    • Scroll down to the Shutter Parameters section.

    • Find the Shutter Gap option and input the desired gap value, for example, 12mm.

  4. Confirm and Publish Changes:

    • Proceed to the confirmation step and review the changes you are making.

    • Publish the changes and exit.

  5. Verification:

    • The bulk edit SKU structure will be triggered, and all selected SKUs will have the specified shutter gap applied.

    • Check a few SKUs to verify the changes.

Summary:

  • Modify the shutter gap for double swing shutters at an individual SKU level or in bulk.

  • Ensure changes are saved and published for consistency across all selected SKUs.

By following these steps, you can efficiently manage and modify the shutter gap for double swing shutters, ensuring alignment with your design and construction requirements.

Did this answer your question?